8th September 2008 While Leofric continue work on the internal lining, Bisley have returned to complete some initial backfilling around the building. |
8th September 2008 Backfilling on the car park side. |
11th September 2008 The inside is being lined with OSB and plasterboard. |
11th September 2008 These bricks are waiting to be used to form the front wall, either side of the entrance door. |
12th September 2008 The first layer of the lining in the rear gable is finished. This will now be lined with a layer of plasterboard. |
12th September 2008 The blockwork inner skin of the wall either side of the main entrance has been started. |
12th September 2008 These walls form three sides of the disabed toilet. |
12th September 2008 The is a view of the main entrance from inside. |
12th September 2008 At the end of the day, the blockwork is shoulder high and the insulation is being installed. |
|
|
|