11th August 2008 The walls are going up fast. The east wall is nearly finished. The packages in the foreground contain some of the insulated roof panels. |
11th August 2008 This view clearly shows the locations of the windows and door. |
11th August 2008 These packages contain the insulation that will go inside the walls. |
11th August 2008 Another view of the east wall, taken from inside. |
12th August 2008 This is a package of roof panels. They consist of two profiled steel sheets separated by 80mm of insulation. |
12th August 2008 All the concrete panels have been fitted to the east wall and a start has been made on the south. |
12th August 2008 Progress has also been made with the west wall. This photograph is taken from inside, looking towards the stores buildings. |
14th August 2008 All the concrete panels have been installed. This is the west wall, which faces the car park. |
14th August 2008 This is the front, where the main entrance will be. The gap in the concrete panels will be filled with brickwork and the main entrance door. |
14th August 2008 The eaves flashing has been fixed along the top of the east wall. |
14th August 2008 Netting has been hung from beneath the rafters for safety reasons while the roof panels are fitted. This is a view of the future toilet areas. |
15th August 2008 The fist of the roof panels have been fixed. |
15th August 2008 The underside of the panels is finished in white. This will be visible inside the hall, but will also have acoustic panels attached to help limit noise. |
16th August 2008 Another view of the underside of the roof. |
16th August 2008 A view of the roof from eaves level. |
16th August 2008 These are the roof panels. The topmost panel is upsidedown, so this is the surface that will be visible from beneath. |
16th August 2008 Another view of the first roof panels. |
|