1st March 2009 The hall has been cleared so that the flooring work can start. The whole area will be grit-blasted, followed by the application of a damp-proof coating and then the flooring. |
1st March 2009 Signs have been fitted to the toilet doors. |
1st March 2009 Fire safety signs have been put up. |
1st March 2009 Rohallion Security have supplied and fitted an alarm for the building and the stores, free of charge. Thank you Rohallion. |
1st March 2009 The base for a third prefabricated garage has been cleared. |
4th March 2009 The concrete floor has been grit-blasted today to provide a key for the surface damp proof membrane that will protect the flooring from the remaining moisture in the concrete. |
4th March 2009 These are the materials for the damp proof membrane. First a levelling coat is applied, followed by an epoxy resin. |
4th March 2009 After the damp proof membrane has been applied, a further levelling coat is needed to provide an absorbent surface for the flooring adhesive. |
4th March 2009 Tongued and grooved chipboard flooring has been obtained for the loft, together with a loft ladder. |
9th March 2009 Work has continued on the floor preparation. This is the first layer of levelling compound, which goes under the damp proof membrane. |
9th March 2009 Another room with the first layer applied. The toilets, kitchen, meeting room, part of the corridor and about 25% of the hall have been treated today. |
11th March 2009 This is the damp proof membrane. The final floor covering won't be nearly as bright and shiny! |
14th March 2009 Work has started on a further prefabricated garage. This will be used to house the minibuses and for drying tents. The garage is being lifted up by 150mm with two courses of bricks to provide sufficient headroom for the minibuses. |
14th March 2009 The finished brickwork, ready for the new garage structure. |
14th March 2009 Demolition of the old pavilion has started. |
16th March 2009 A primer has been applied to the Meeting Room floor in preparation for the final levelling coat. |
18th March 2009 The damp proof membrane has been applied over the Hall floor. |
18th March 2009 This is the final levelling coat on the Meeting Room floor. Almost ready for the floor. |
20th March 2009 The vinyl safety floor is being laid out in the Main Hall in preparation for cutting. |
20th March 2009 The floor has been started in the gents toilet. In the toilets, the flooring will be turned up at the edges to form a waterproof skirting. |
21st March 2009 Rohallion have fitted security alarms to the two store buildings. |
21st March 2009 The floor layers are working over the weekend. |
21st March 2009 The kitchen with its new floor. |
21st March 2009 Floor boards are being put down in the loft. |
22nd March 2009 The edge of the toilet floors has been finished with a coved skirting detail. |
23rd March 2009 The meeting room floor has been finished. |
24th March 2009 The hall floor is now down. |
24th March 2009 Cubicles have been installed in the male toilet. |
25th March 2009 The disabled toilet has been completed. |
28th March 2009 This machine makes short work of demolishing the pavilion. |
28th March 2009 Most of the pavilion is timber and burns well. |
28th March 2009 A ladder has been fitted to access the loft space, which will be used for storage. |
29th March 2009 A new view of the building across the smoking remains of the pavilion! |
4th April 2009 The land is being prepared for new grass seed. A special heavy duty grass is being used. One of the parents has obtained the seed at wholesale price and is providing fertilisers free. |
6th April 2009 Some volunteers picking up stones. The remainder of the pavilion has also been burnt. |
6th April 2009 A fire resistant shutter has been installed on the inside of the kitchen servery hatch. |
|
|
|